Tips For Laying Sod Be Sure To Lay The First Row Of Sod Against A Straight Edge, Such As Your Fence Or Patio.
Remove sod from hole and place it in a bucket of water. Add peat moss or compost if needed to improve drainage. Water within at least a 1/2 hour of completing an area.
To Install Sod On An Existing Lawn, Cut Any.
On slopes, start at the bottom and run perpendicular. Laying sod can transform a stretch of flat dirt to a lush. This means right through the grass to the root side and into the top soil below for a depth of at.
Be Careful To Not Push Up Any Loose Turf Edges.
Test the topsoil ph with a chemical soil test to determine if changes are necessary. Place sod in the hole. Soak the new sod thoroughly.
Staple The Sod In Place.
But remember you will need make the sod level with any edges such as walkways, driveways, or any other surface level with the ground. Prepare the site by grading so that the soil slopes away from foundations and buildings, thus avoiding drainage problems. In the second week, water every other day.
Water The New Lawn Once A Day During The First Week, Ideally Early In The Day So The Sod Has Plenty Of Daylight Time To Absorb The Water.
Proper soil preparation is the most important part of laying a new sod lawn. The basic steps to soil. Acidic soils with a ph of 6 and below can be improved with the.